Denver, CO New Construction Roof: Low-Slope EPDM, Standing Seam Metal Accents, and GAF HDZ Garage
Roof Replacement

Denver, CO New Construction Roof: Low-Slope EPDM, Standing Seam Metal Accents, and GAF HDZ Garage

Denver, CO·2026·New Install·Multi-Family

Quick Facts

Location: Denver, CONeighborhood: HighlandNearby areas: Berkeley, Sunnyside, LoHiBuilding type: New construction duplex with detached garageStories: Two-storyDate completed: June 2026Total project cost: $33,276.66Low-slope EPDM main roof: $21,368.15, 22 squaresStanding seam metal accents: $6,932.30, approximately 4 squaresDetached garage asphalt roof: $4,976.21, 11 squares
Drone view of the new construction duplex in Denver’s Highland neighborhood, with black standing seam accents below the low-slope EPDM roof
1 / 11

Project background

New construction project with a custom home builder. No tear-off or decking replacement required. Work was staged across the overall build schedule in dry-in and install phases to coordinate with other trades.

Low-slope roof (main duplex)

Low-slope quantity: 22 squares

Material installed: Mule-Hide 60 mil non-reinforced EPDM membrane

Insulation: Tapered EPS insulation system

Cover board: DensDeck Primed

Flashing: All roof-to-wall transition flashing new, with EPDM termination

Standing seam metal accents

Metal accent quantity: approximately 4 squares

Material installed: 26 GA standing seam metal, flat iron nail strip

Color: Black

Underlayment: Titanium PSU-30 HT premium high-temp ice and water shield

Detached garage roof

Garage roof quantity: 11 squares

Material installed: GAF Timberline HDZ asphalt shingle, Charcoal

Fire rating: Class A fire-rated roof system

Impact rating: Class 3 impact-resistant shingle

Underlayment: Synthetic felt field underlayment, with ice and water shield installed at the eaves, in all valleys, and around all penetrations

Flashing: All flashings and drip edge new, color to match

Pipe boots: New pipe boots installed

Warranty

Manufacturer warranty: Standard GAF lifetime manufacturer warranty on the shingled portion; Mule-Hide manufacturer warranty on the EPDM portion

Workmanship warranty: 5-Year Pak Exteriors Workmanship Warranty

Installation, permits, and inspections

Installation duration: dry-in and install phases, spread across the full build schedule

• Low-slope EPDM main roof: dry-in 1 day, install 2 days

• Standing seam metal accents: dry-in 1 day, install 1 day

• Detached garage shingle: dry-in 1 day, install 1 day

Permits: City and County of Denver

Inspections completed:

• Roof final inspection (No mid-roof inspection required)

Permit status: Permit passed and finaled

What would your roof cost?

Enter your address for an instant roof estimate measured from satellite imagery, or book a free inspection and we'll measure it in person.

Colorado roofing
Ready to Get Started?

Find Out What Your Project Will Cost

Schedule an inspection to discuss your project. No obligation, no pressure.